Skip to Content

Corporate Plumbing Projects

Envisioning More Than Just Concrete and Steel

Corporate

3201 Olympus Blvd / Cypress Waters

Contractor: Structure Tone Southwest
Location: Dallas, Tx

"A masterclass in tilt-up construction, 3201 Olympus Blvd seamlessly merges industrial efficiency with corporate elegance to anchor Nokia’s North American headquarters at Cypress Waters."

Located within the 1,000-acre Cypress Waters development in Dallas, 3201 Olympus Blvd serves as the consolidated North American headquarters for telecommunications giant Nokia. Developed by Billingsley Co. and constructed by Structure Tone Southwest, the 250,000-square-foot facility is a premier example of modern tilt-up concrete design.

The five-story office building features high-performance glass panels and a sophisticated concrete shell, earning it a 2020 Tilt-Up Achievement Award for excellence. Designed to maximize natural light and offer sprawling views of North Lake, the project successfully integrated complex site logistics and a high-end interior fit-out. The campus is supported by a four-level precast parking garage and is a central anchor in the amenity-rich Cypress Waters lakeside community.

Mercedes Benz in Alliance

Contractor: Hillwood Construction Services
Location: Fort Worth, TX

"Custom-engineered to support a world-class workspace, this build-to-suit plumbing solution anchors the national operations hub for Mercedes-Benz Financial Services."

Corporate
Build-to-Suit complete plumbing scope for office complex to serve as Mercedes-Benz Financial Services’ national business operations center.
Corporate

Granite Place at Southlake Town Square

Contractor: Ridgemont Construction
Location: Southlake, TX

"A seamless design-build achievement, Granite Place delivers 158,000 square feet of Class A office space and integrated parking to the heart of Southlake Town Square."

Design/Build 158,000 square foot, six-story office building including a five-story parking garage.

Lakeside International Office Center

Contractor: Muckleroy & Falls
Location: Flower Mound, TX

"Located within a three-minute drive of DFW International Airport, this strategic development blends Class A office space with direct trail connectivity to the vibrant Shops at Lakeside."

Corporate

Realty Capital and Staubach Capital have launched construction on the Lakeside International Office Center, a two-building office development in Flower Mound, Texas. Located at 737 and 777 International Parkway, the project sits just a three-minute drive from the north entrance of Dallas/Fort Worth International Airport.

The development features a four-story, 120,000-square-foot flagship building and a secondary 18,000-square-foot structure. Designed by Boka Powell, the campus will offer modern amenities including a tenant lounge, coffee bar, and a dedicated trail system connecting to the nearby Shops at Lakeside. The project has already secured its first major tenant, IntelliCentrics, which has leased the entire 30,000-square-foot fourth floor of the main building. Completion is slated for the third quarter of 2020.

Corporate

Fox Electric

Contractor: Bob Moore Construction
Location: Arlington, TX

"A tailored design-build achievement, this 15,000-square-foot facility provides a modern, two-story light industrial headquarters for the continued growth of Fox Electric."

Design/Build for a new 15,000 square foot, two-story light industrial office building for an existing business.
Past Projects
Corporate

Connect With Our Team